Lucas Marc Academy

Lucas_Cover_New

Project Details

TYPE: New Construction
YEAR: 2010
SIZE: 14,468 sq/ft
VALUE: $1.5 Million

Modern, sleek design from the ground up.

The academy is located in the busy business district at Gage and Steptoe in Richland. The academy occupies 10,968 sq/ft of well-lighted, air conditioned, and fully equipped floor space, containing dispensary, five fully modern classrooms, clinic area with styling stations, student locker area, and student lounge. The new facility opened in January of 2011; the new environment is elegant and completely state-of-the-art.

The building consists of concrete block construction with a stucco exterior. The school has a 3,500 sq/ft central training station area, five classrooms consisting of about 600 sq/ft each, plus administrative offices. G2 Construction worked closely with the Architects (Meier Architects & Engineering) for complete site construction which included utility, site drainage, paving, grading, parking, sidewalks, and designated landscape areas.


  • Right from the start, G2 Construction impressed us with their efficient, professional manner…and approach that not only inspired confidence, but also generated the results we were looking for. We would like to send thanks to the office staff, as well as the entire construction crew for their patience and professionalism throughout our entire project.–Dawn Hatch